1. Silvercord Shopping Centre
Location : B/F to 3/F Silvercord, 30 Canton Road, Tsim Sha Tsui.
Scope of Works : MVAC, P&D and Electrical Installation.
Period : Aug 2010 to Jan 2011
2. The Link – Tai Yuen Market.
Location : Tai Yuen Market of Tai Yuen Estate, Tai Po.
Scope of Works : A&A Works for Electrical Installation.
Period : Jul 2010 to May 2011
3. The Open University of Hong Kong
Location : A12 of The open University of Hong Kong
Scope of Works : A&A Works for Electrical and MVAC Installation
Period : Aug 2010 to Oct 2010
4. Renovation Work at Ocean Gallery (Phase 1 Works)
Location : Ocean Gallery, Harbour City, Tsim Sha Tsui, Kowloon
Scope of Works : A&A Works for Building Services Installation
Period : Jun 2011 to Oct 2012
5. Improvement Works at Tai Po Market Station, Contract K0108-11C
Location : Tai Po Market Station
Scope of Works : Improvement Work for Electrical and MVAC Installation
Period : Jun 2011 to Apr 2012
6. Renovation Works at Oi Man Commercial Centre
Location : Oi Man Shopping Centre
Scope of Works : Renovation Work for Electrical and MVAC Installation
Period : Sept 2011 to Dec 2012
7. The Link – Tai Yuen Market
Location : Phase 3 Renovation Work of Tai Yuen Market of Tai Yuen Estate, Tai Po.
Scope of Works : A&A Works for Electrical Installation.
Period : Aug 2011 to Dec 2011
8. Renovation Work at Chung Fu Shopping Centre (The Link)
Scope of Works : A&A Works for Electrical Installation.
Period : Jul 2012 to May 2013
9. Proposed A&A Works at Sub-basement to 1/F, Block A, Harbour City
Scope of Works : A&A Works for Building Services Installation
Period : Jul 2012 to Oct 2013
10. Improvement Works to CuC at TWL & ISL, Contract no. C4201-12C
Scope of Works : A&A Works for Electrical and MVAC Installation
Period : Jul 2012 to Dec 2013
11. A&A Work for Apartment 25-36, Senior Staff Quarter, Phase II at The HKUST
Scope of Works : A&A Works for Electrical, Plumbing and Drainage Installation
Period : Jun 2012 to Dec 2012
12. Renovation Work at Ocean Gallery and Ocean Centre (Phase 2 Works)
Location : Ocean Gallery, Harbour City, Tsim Sha Tsui, Kowloon
Scope of Works : A&A Works for Building Services Installation
Period : Oct 2012 to Oct 2013
13. Hong Kong Exchanges and Clearing Limited Data Centre
Location : Data Centre, at Tseung Kwan O Industrial Estate
Scope of Works : Install aluminum SS shelter with drainage pipe and WLDs
Period : Mar 2013 to Apr 2013
14. Proposed Major A & A Works at Ocean Terminal, Harbour City
Location : Ocean Terminal, Harbour City, Tsim Sha Tsui, Kowloon
Scope of Works : A&A Works for Building Services Installation
Period : May 2013 to May 2015
15. Renovation Works (3rd) ST Clare’s Primary School
Location : 3-6 Prospect Place, Bonham Road, Hong Kong.
Scope of Works : A&A Works for Electrical and MVAC Installation
Period : Mar 2013 to Sept 2013
16. Renovation Work at Lung Cheung Plaza (The Link)
Scope of Works : A&A Works for Electrical Installation.
Period : July 2014 to May 2016
17. Renovation Work at Sau Mau Ping Shopping Centre (The Link)
Scope of Works : A&A Works for Building Services Installation
Period : July 2015 to Aug 2016
18. A&A Works of Existing Tranformer Room “L” & Shop 304-6 at B1/F-G/F
Gateway II, Harbour City.
Scope of Works : A&A Works for Electrical, MVAC, P&D & BMS Installation
Period : Oct 2015 to Oct 2017
19. A&A Work at G/F at Gateway 1, Harbour City (Cinema Conversion).
Scope of Works : A&A Works for Electrical, MVAC, P&D & BMS Installation
Period : Sep 2016 to Dec 2016
20. West Rail Tsuen Wan West Station TW5 Cityside Property Development.
At Tusen Wan Town Lot No.417, 98 Tai Ho Road, Tsuen Wan.
(Project No: J3568)
Scope of Works : Plumbing Installation
Period : Sep 2015 to May 2020
21. Asset Enhancement Works at Wah Ming and Cheung Wah Shopping Centre, Fanling
Scope of Works : A&A Works for Electrical Installation
Period : Aug 2016 to Jul 2017
22. Cathay Pacific G16 Business Class Lounge in HK International Airport
Scope of Works : A&A Works for Electrial, MVAC & P&D Installation
Period : Aug 2016 to Apr 2017
23. Asset Enhancement Work at Fu Shin Shopping Center
Scope of Works : A&A Works for MVAC Installation
Period : Nov 2016 to Jul 2017
24. Renovation Works at Fu Tung Market
Scope of Works : A&A Works for Electrial, MVAC & P&D Installation
Period : Feb 2017 to Jul 2017
25. Alteration and Addition Works at TKO Gateway
Scope of Works : A&A Works for MVAC & P&D Installation
Period : May 2017 to Mar 2018
26. Asset Enhancement Works at Wan Tsui Commercial Complex, Chai Wan
Scope of Works : A&A Works for P&D Installation
Period : Sept 2017 to Aug 2018
27. NKIL6512 Interior Fitting Out Works for Podium NSC
Scope of Works : A&A Works for Electrical Installation
Period : Mar 2018 to Feb 2020
28. A&A works at Harbour Front Shop Reconfiguration at GL 4-10 at Ocean Terminal, Kowloon
Scope of Works : A&A Works for E&M Installation
Period : Jan 2018 to May 2018
29. Professor Charles Kao Aquare, Clifford C.F. Wong Secondary Library
Scope of Works : A&A Works for MVAC Installation
Period : June 2018 to Sept 2018
30. Asset Enhancement Works at Tsz Wan Shan Shopping Centre (Phase 2)
Scope of Works : A&A Works for MVAC & P&D Installation
Period : Oct 2018 to Jan 2020
31. Provision of Public Toilets at Yau Ma Tei Station
Scope of Works : A&A Works for E&M Installation
Period : Nov 2018 to July 2020
32. E&M Site Survey For Ocean Terminal
Scope of Works : Site Survey
Period : Jul 2019 to Dec 2019
33. Fitting Out Work for the Center Office Renovation at 58/F
Scope of Works : A&A Works for E&M Installation
Period : Nov 2018 to July 2020
34. Renovation Work for Toilets at Hang Seng Tsuen Wan Building
Scope of Works : A&A Works for E&M Installation
Period : Mar 2020 to Jun 2021
35. Tenancy Works for Batch 2 at The Quayside
Scope of Works : A&A Works for E&M Installation
Period : Mar 2020 to Jun 2021
36. Grand Stair and Main Entrance Improvement Works, at Ocean Terminal, TST
Scope of Works : A&A Works for E&M Installation
Period : Jul 2020 to Nov 2020
37. F&B Conversion at Shop OTG47,48 and Nursery Room at Ocean Terminal
Scope of Works : A&A Works for E&M Installation
Period : Jul 2020 to Nov 2020
38. A&A Works for Centre for Intelligent Multidimensional Data Analysis at HKSTP (19W)
Scope of Works : A&A Works for E&M Installation
Period : Jan 2021 to Apr 2021
39. A&A Works for AI-Powered Financial Technologies Ltd at HKSTP (19W)
Scope of Works : A&A Works for E&M Installation
Period : Jan 2021 to May 2021
40. A&A Works for Combination of Shop G001 & G002 at G/F at Ocean Centre
Scope of Works : A&A Works for E&M Installation
Period : Apr 2021 to Jun 2021
41. Conversion of Offices to Medical Floors at 11/F and 15/F at Ocean Center
Scope of Works : A&A Works for P&D Installation
Period : Apr 2021 to Jun 2021
42. A&A Works for Shop 2307 at 2/F Gateway I, Harbour City
Scope of Works : A&A Works for E&M Installation
Period : Jul 2021 to Nov 2021
43. Relocation of Water Meters and Associated Diversion Works at Ocean Terminal, Harbour City
Scope of Works : A&A Works for E&M Installation
Period : Jul 2021 to Mar 2024
44. MVAC Installation at Bradbury School
Scope of Works : A&A Works for E&M Installation
Period : Nov 2021 to Sept 2022
45. Renovation Works at Block 9 Central Magistrates Tai Kwun – Black Sheep Restaurants
Scope of Works : A&A Works for E&M Installation
Period : Nov 2021 to Jan 2023
46. 3/F Alternation and Additional Work at Bradbury School
Scope of Works : A&A Works for E&M Installation
Period : Jul 2022 to Sept 2022
47. Temporary Power and Water for Tai Wai Station Property Development
Scope of Works : A&A Works for E&M Installation
Period : May 2022 to Jun 2023
48. Re-instatement of shop front for Shop G05b, K11 Artmall
Scope of Works : A&A Works
Period : Sept 2022 to Dec 2022
49. Renovation Works at Level 0 of Kwok Tak Seng Building, HKMU
Scope of Works : A&A Works for E&M Installation
Period : Nov 2022 to Jul 2023 .
50. 新界友聯船廠J座辦公樓一樓至五樓室内裝修工程
Scope of Works : A&A Works for E&M Installation
Period : Mar 2023 to Nov 2023
51. Enhancement of Training Workshops and Facilities TAD & KBD (ELE & MVAC)
Scope of Works : A&A Works for E&M Installation
Period : Aug 2023 to Nov 2023
52. Chemical Waste Treatment Centre – Turbine Building – Electrical and Ventilation
Scope of Works : A&A Works for E&M Installation
Period : Sept 2023 to Oct 2024
53. Enhancement Works AMC of TKO Innopark Works
Scope of Works : A&A Works for E&M Installation
Period : Jan 2024 to Jun 2024
54. Taikoo Place – Renovation of Common Corridor, Lift Lobby and Toilet in 2024 & 25
Scope of Works : A&A Works for E&M Installation
Period : Jul 2024 to Mar 2025
55. 新界友聯船廠裝修工程
Scope of Works : A&A Works for E&M Installation
Period : Jul 2024 to Now
56. The Bridge Resumption in HKIA
Scope of Works : A&A Works for E&M Installation
Period : Oct 2024 to Apr 2025
57. Asset Enhancement Works at Yat Tung Shopping Centre
Scope of Works : A&A Works for E&M Installation
Period : Mar 2025 to Now

